Fog City SF Knob and Tube
(628) 296-7628Mon-Sun 7am-6pmGet an Estimate
San Francisco and the East Bay

Knob and tube risk assessment

Free tool

Fog City SF Knob and Tube manages knob and tube replacement across San Francisco and the East Bay; licensed and insured electrical contractors (California C-10) carry out the electrical work. This knob and tube risk assessment asks 10 plain questions about what you already know and sorts the answer into how soon to act and what to do next. Nothing is sent, and nothing asks you to touch or open anything.

Where

San Francisco and the East Bay: Berkeley, Oakland, Alameda and Piedmont.

Assessment

Where your building stands

Answer from what you already know: an inspection report, an insurer's letter, the listing, what you have seen in passing. The result explains itself, and it never stands in for an electrician on site.

1What has you looking into knob and tube right now?
2What kind of building is it?
3Roughly when was it built?
4What do you already know about knob and tube in the building?

Answer from what you have been told or have already seen. There is no need to go and look.

5Has any rewiring been done since the building was built?
6Does the electrical panel have fuses or circuit breakers?

Answer from an inspection report, the listing or what you already know. There is no need to open the panel.

7Have you noticed any of these?

Choose all that apply.

8What about insulation in the attic or walls?
9Who lives in the building now?
10Is there a date you need an answer by?

0 of 10 answered

Your result

Answer the 10 questions and your result appears here. Nothing is sent anywhere, and every question is about what you already know.

Method

How the result is decided

Fixed rules, in order

  1. Heat, scorching or a burning smell comes first: stop using that circuit and call an electrician today.
  2. A building put up after 1950 with nothing pointing to knob and tube gets an honest "probably not the question here".
  3. An insurer, a purchase, a sale or a date within a month sets a deadline.
  4. Planned insulation means settling the wiring before it goes in.
  5. Insulation already over unknown wiring, flickering lights, frequent trips or known live knob and tube mean soon.
  6. Electrification, a remodel or a finaled rewire each get their own plan; anything else is planning, not urgent.

The same answers always give the same result, and the result lists the answers that decided it.

What it cannot tell you

No questionnaire can see inside a wall. It cannot say whether any wiring is live, whether a building is safe, or whether an insurer will write or renew a policy; insurers set their own rules, as the knob and tube insurance guide explains. What it does is put the questions in the order an electrician would, so the walk-through starts in the right place.

A test of every circuit, with a written circuit record, is what answers the rest; the knob and tube inspection page covers it, and the knob and tube wiring guide explains what is being tested. If insulation is part of the plan, read attic insulation and knob and tube first. For a budget, use the cost estimator.

Get an Exact Quote

Send the result with your request, and the walk-through is planned around it.

Get an Exact Quote

Tell us where the building is and what prompted the question. Your assessment answers and result are added to the request.

Fog City SF Knob and Tube
2141 Mission St
San Francisco, CA 94110
office@fogcitysfknobandtube.com

Step 1 of 2

The house and the work
(628) 296-7628Tap to callGet an Estimate